The weather was warm and 30's over the weekend, besides the huge moon with a ring around it, it allow for work to really begin on the outside of the building. The bright red paint was coming off but not without some effort....
Gabe work with the sander while Steve worked at ground level with the time tested scraper.
No comments:
Post a Comment